Installation Overview Newsome has efficiently finalised the installation and commissioning of a new 400 kW chiller at a well-known confectionery manufacturing site in York. This initiative supports a substantial step forward in the client’s ESG framework, enhancing process stability and achieving measurable reductions in both energy demand and carbon output. https://newsome.ltd.uk/case-studies/high-efficiency-400-kw-chiller-installation-delivers-50000-annual-energy-savings-and-200-tonnes-co%e2%82%82-reduction/